One of our clients, active in the emulsifier industry, has asked Prove to expand its finishing capabilities by installing a new liquid fill system. The new system should be able to fill IBCs and drums and needs to be fully integrated with the client’s PLC.
After consulting the client’s technical and production staff and several suppliers, a semi-automatic system was chosen, which will be connected to the existing process routing in the factory. The system has an air extraction system to prevent unwanted fumes in the packaging area and is built according to GMP standards eliminating flat surfaces and dead rooms where possible. Furthermore, the system will be fully cleanable.
Prove has been asked to guide the process from start to finish, including drawings, negotiations, construction management and operator training.